HOW TO
INSTALL THE FEED PUMP
AND TOTAL TOWER IN A COOLING
TOWER
THIS INSTALLATION DOES NOT
REQUIRE TOWER SHUTDOWN
(1) Move the TOTAL TOWER drum
to a location close to the
system circulating pump.
(2) With the assistance of
the equipment operator, select a
TOTAL TOWER injection point on
the discharge side of the
circulating pump. insert a
"T" in the pressure
gauge assembly. Do not move the
gauge to make this installation
until the valve between the
water line and the gauge has
been securely closed. Connect
the plastic tubing to the
"T." Replace the
pressure gauge, but do not
reopen the shutoff valve at this
time.
(3) Set the Feed Pump on the
drum head, or mount it on the
wall about 8 inches above the
drum. Connect the siphon tube
and insert it into the drum.
Connect the discharge tubing
from the Tower Tender to the
injection fitting. Now, reopen
the shutoff valve.
(4) With the assistance of
the maintenance man, locate the
tower bleed-off assembly. Insert
the electric bleed valve,
followed by the 4 gpm flow
regulator. Wire the electric
bleed valve to the Feed Pump.
Electrical services should be
performed by the electrician,
and should conform to local
code.
(5) Plug the line cord into a
110 volt outlet. Use electrical
service outlet that is energized
only when the tower
circulating water pumps are
operating. You are now ready to
add TOTAL TOWER, as needed, to
control scale and corrosion and
also ready to bleed water from
the system, as required, to
maintain control over the total
solids in the circulating water.
1. Initial Charge
To bring the tower water up to
operating strength, put in TOTAL
TOWER at the rate of 2.5 pints
per 1000 gallons of system
water. Estimate 10 gallons per
rated ton.
EXAMPLE: 300 tons = 3000 gallons
= 7.5 pints.
This can be done at the tower
basin or a holding tank. Get the
operator to help choose the most
convenient location. After two
hours of operation, test the
tower water for TOTAL TOWER
content. The reading should be
between 240 and 300 ppm.
2. Interim Setting for the
Feed Pump
To maintain the proper level of
TOTAL TOWER in the tower water,
set the Feed Pump according to
this chart:
RATED CAPACITY
240
200
150
100
50
of the Tower
Tons
Tons
Tons
Tons
Tons
TIMER SETTING
5
4
3
2
1
Instruct the operator how to run
daily tests for TOTAL TOWER
level. Furnish a Test Kit and
Log Sheets to record these
readings. Tell him you will
return in several days to
inspect the Log Sheet and make
recommendations based on the
data recorded.
3. Continuous Maintenance
Feed Rate
On your first service call,
review the Log Sheet. Confirm
the figures by personally
running the following tests
before making any "fine
tuning" adjustments in the
Feed Pump.
TOTAL TOWER Titration
Scale and corrosion
protection are performed most
effectively when the TOTAL TOWER
content of the tower water is
between 240 and 300 ppm. If your
test result is lower than 240
ppm, or over 300 ppm, you may
have been given an inaccurate
estimate of the tower tonnage.
The Feed Pump knob can be moved
higher or lower than its present
position, according to your new
information.
EXAMPLE: If you originally
set the knob at Position #2 or a
two-ton tower, and your first
TOTAL TOWER test shows 180 ppm,
the Tower Tender knob should be
moved up to between Positions #2
and #3. If a change of setting
is indicated, return within a
week and repeat the tests for
confirmation.
Molybdenum Testing
This is in the treatment as a
corrosion inhibitor and is easy
to analyze using our
instruments. The molybdenum is
in the water at the
specification level when the
treatment level is correct.
4. Teach The Operator To
Make Daily Tests
The full cooperation of your
customer and his staff is the
difference between success and
mediocrity. Run through the two
tests with these people. Tell
them how to enter the results on
the Log Sheet. Urge them to
phone you for service when the
Log shows any deviation from
normal. Explain that prompt
service at this time will